Mounting; Installation Site; Installation On A Carrier Rail; Figure 8: Snapping Onto The Carrier Rail - WAGO 852-1112 Manual

8-port 1000base-t-industrial-eco-switch
Table of Contents

Advertisement

26

Mounting

Pos : 23.1 /All e Seri en ( Allgemei ne Module)/Ü bers chriften/Ebene 1/M ontier en - Ü bersc hrift 1 @ 3\mod_1225446744750_21.doc x @ 24900 @ 1 @ 1
5
Mounting
Pos : 23.2 /Serie 852 (ETH ERNET-Zubehör)/Montier en/Montageort 852- 1112 @ 27\mod_1474980756125_21.doc x @ 220957 @ 2 @ 1
5.1

Installation site

The location selected to install the industrial ECO switch may greatly affect its
performance. When selecting a site, we recommend considering the following
rules:
Install the industrial ECO switch at an appropriate place. See section
"Device Description" > ... > "Technical Data" for the acceptable
temperature and humidity operating ranges.
Pos : 23.3 /Serie 852 (ETH ERNET-Zubehör)/Montier en/Monti eren 852-1112 @ 27\mod_1471944778442_21.doc x @ 219011 @ 2 @ 1
Make sure that the heat output from the industrial ECO switch and ventilation
around it is adequate. Do not place any objects on the industrial ECO switch.
5.2

Installation on a Carrier Rail

The carrier rail must optimally support the EMC measures integrated into the
system and the shielding of the internal data bus connections.
Place the industrial ECO switch onto the carrier rail from the top and snap it into
position.

Figure 8: Snapping onto the Carrier Rail

WAGO-ETHERNET-Zubehör 852
852-1112 8-Port 1000BASE-T-Industrial-Eco-Switch
Version 1.1.0FW/HW-Version 01/01
Manual

Advertisement

Chapters

Table of Contents
loading

Table of Contents