5
CC-LINK UTILITY
5.7

Test Tab

A network test and line test for the mounted CC-Link module can be executed from this
tab.
(1) Precautions for the Test tab
(2) Test tab
Module information
Other station monitoring
Item
Target module
Start I/O No.
5
- 18
5.7 Test Tab
(a) Connection status for testing
The network and line test can be executed while the CC-Link module is online.
While in offline, the both tests cannot be executed.
(b) Line test
Select station(s) to be tested by selecting either "All stations (1 to 64)" or
"Selected station" as necessary and then conduct the test.
(
Page 5-19, Section 5.7 (3))
(c) When an communication error has occurred
To restart the communication, set data again in the Connection settings.
Table 5.15 Description of the Test tab
Online operation
Select a module for testing.
(Default: "1" slot)
Displays the start I/O No. of the CC-Link module.
Q12DCCPU-V
Figure 5.14 Test tab
Parameter settings
Target settings
Description
Q06CCPU-V
Q06CCPU-V-B
Test
(To the next page)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q06ccpu-vQ06ccpu-v-bSw3pvc-ccpu-e