Mitsubishi Electric Q12DCCPU-V User Manual page 136

Melsec-q series c controller module
Hide thumbs Also See for Q12DCCPU-V:
Table of Contents

Advertisement

5
CC-LINK UTILITY
5
- 20
5.7 Test Tab
(b) Network test
The network test can be conducted only when the data link status of the CC-Link
module is "In data link" or "Perform auto-return". (
1) Setting
Select whether to start or stop a data link and then click the
the test.
2) Result
The test result is displayed on the following screen.
For details of error codes, refer to Help of the bus interface function.
Figure 5.17 Network test screen
Figure 5.18 Network test result screen
Page 5-2, Section 5.2)
OK
button to start

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q06ccpu-vQ06ccpu-v-bSw3pvc-ccpu-e

Table of Contents