Pre-Operation Considerations; Storage Function - Veikong gpd 515/g5 Startup Manual

Simplified startup procedure
Table of Contents

Advertisement

2.6

PRE-OPERATION CONSIDERATIONS

• After completing the Test Run, connect the motor to the load.
• Additional control circuit wiring can be added, and parameters in the drive can be
programmed to configure the drive system to your specific application, including "Remote"
(2-wire or 3-wire) Control. See Section 5 for description of programmable features, and
also see instruction sheets for any options included with the drive.
• Record all parameter values (see Quick Reference sheets at the front of this manual).
2 . 7
S T O R A G E FUNCTION
The drive uses internal NV-RAM to store information when power is removed or in the event
of a power failure. Therefore, when power is reapplied, operation will begin at the same
state as when power was removed.
The following information is stored:
Last Main Speed Reference setting and forward/reverse selection from Digital
Operator.
The sequence of failure conditions that occurred before power was removed
(including content of a " CPF " failure).
2-27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents