Precautions when preparing a cable
(1) Cable length
The total distance (between GOT and controllers) of
RS-422 cable must be 13m or less.
(2) Connector conversion box side connector
For the connector conversion box side connector, refer
to the following.
6.6 Connector Conversion Box
(3) External cable side connector
For the connector specifications of the external cable
side, refer to the following.
8.2 External Cable, Relay Cable
(4) GE PLC side connector
Use the connector compatible with the GE PLC side.
For details, refer to the GE PLC user's manual.
Connecting terminating resistors
(1) GE PLC side
When connecting a GE PLC to the GOT, a terminating
resistor must be connected.
GE PLC user's Manual
55. CONNECTION TO GE PLC
55.3 Connection Diagram
48
49
50
51
52
53
54
55
55 - 23