ABB RET670 Applications Manual page 439

Hide thumbs Also See for RET670:
Table of Contents

Advertisement

1MRK504116-UUS C
Application manual
Single phase-
to-ground fault
ANSI05000492 V3 EN
Figure 196:
Step 1 fault calculation 1
This calculation gives the current fed to the protection: 3I
To assure that step 1, selectivity to other ground-fault protections in the network a
short delay is selected. Normally, a delay in the range 0.3 – 0.4 s is appropriate. To
assure selectivity to line faults, tripped after a delay (typically distance protection zone
2) of about 0.5 s the current setting must be set so high so that such faults does not
cause unwanted step 1 trip. Therefore, a fault calculation as shown in figure
YN/D or YN/Y
transformer
Three phase CT
summated
3I
0
alt
Single CT
51N
ANSI05000492_3_en.vsd
.
0fault1
Section 3
IED application
197
is made.