ABB RET670 Applications Manual page 388

Hide thumbs Also See for RET670:
Table of Contents

Advertisement

Section 3
IED application
382
With all phase voltages and phase currents available and fed to the protection IED, it is
recommended to set the MeasureMode to positive sequence.
The impedance settings are set in pu with ZBase as reference:
2
UBase
400
=
=
ZBase
SBase
1000
EQUATION1960 V1 EN
=
+
ZA
Z line
(
)
Zsc station
(
EQUATION1961 V1 EN
This corresponds to:
+
2
j
52
=
=
ZA
0.0125
160
EQUATION1962 V1 EN
Set ZA to 0.32.
=
=
ZB
Zsc station
(
1)
EQUATION1963 V1 EN
This corresponds to:
j
32
=
=
ZB
j
0.20
pu
160
EQUATION1964 V1 EN
Set ZB to 0.2
This corresponds to:
+
2
j
20
=
=
ZC
0.0125
160
EQUATION1966 V1 EN
Set ZC to 0.13 and AnglePhi to 88°
2
=
160
ohm
400
= +
+
2)
2
j
20
j
5000
+
=
Ð °
j
0.325
pu
0.325 88
2
400
=
j
j
32
ohm
5000
=
Ð °
0.20 90
pu
+
=
Ð °
j
0.125
pu
0.126 84
1MRK504116-UUS C
2
= +
2
j
52
ohm
pu
pu
Application manual
(Equation 317)
(Equation 318)
(Equation 319)
(Equation 320)
(Equation 321)
(Equation 322)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents