SSANGYONG 1999 Musso Service Manual page 1427

Table of Contents

Advertisement

Removal & Installation Procedure
1. Remove the hood striker assembly.
Notice
When installing, tighten the bolt after setting the hole
between wratch and hood striker assembly.
Installation Notice
Tightening Toque
2. Remove the hood Mounting bolt and hood lifter assembly.
Installation Notice
Tightening Toque
3. Remove the hood lock, hood relese from the clip.
4. Remove the cable holder screw.
5. Pull the cable nut toward driver side.
6. Installation should follow the removal procedure in the
reverse order.
8 - 11 Nm
14 - 26 Nm
BODY FRONT END 9R-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents