Proceed as follows:
[617]
4.
5.
Close side door of fuser station.
6.
Click on the 'Ready' button on the operator panel:
All units of the printing system are inspected (duration around 2-3 minutes),
before the printing system is switched to the 'Ready' status.
Install dirt bin
Swivel on oiling unit and turn
the oiling unit knob to the right
to lock it.
427