Reference: <17.4.6 Current Value Update Data Area>
Note: The value to be changed by updating the current value is the feedback value after unit
conversion.
13.7.1
R estrictions on Operation
1 3 5 B
The current value update can be executed only when the target axes stop. Although the current value
update function can be executed during the operation of a target axis, the current value update request
during the axis operation (Busy) is ignored, and the current value is automatically updated after the axis
operation stops.
13-10