Chrysler neon 1997 Service Manual page 1643

Table of Contents

Advertisement

CHECK FOR BAD CONNEC-
TEST FOR BODY GROUND
REPAIR GROUND CIRCUIT
NO CONTINUITY REPLACE
CHECK
REPAIR OPEN CIRCUIT OR
FUSELINK TO IGN. SWITCH
TEST
CHECK FOR OPEN CIRCUIT
TEST VOLTAGE AT BOTH
MOTOR
TEST MOTOR CONTINUITY
FUSE BLOCK TO MOTOR
SEE: WIRING DIAGRAMS
REPLACE
TEST BLOWER SWITCH
GROUND CONNECTION
TEST BLOWER MOTOR
REPLACE CONTROL
VOLTAGE PRESENT
BAD CONNECTION
REPLACE MOTOR
SHORTED
TO FUSE BLOCK
TION AT MOTOR
INST.
DEFECTIVE
REPLACE FUSE
ENDS OF FUSE
INSTALL FUSE
NO VOLTAGE
MOTOR O.K.
CONTINUITY
FUSE OPEN
RESIS-
AT MOTOR
FUSE O.K.
STALLED
TOR
MOTOR
REPAIR
PANEL
OR
OPERATE AT SELECTED SPEED
BLOWER MOTOR DOES NOT
24 - 8
HEATING AND AIR CONDITIONING
DIAGNOSIS AND TESTING (Continued)
SWITCHES
TEST
REPAIR
INSPECT RESISTOR
REPLACE CONTROL
CIRCUITS
CIRCUIT
SEE:
O.K.
DIAGRAMS
WIRING
AND
OR
Fig. 11 Blower Motor Electrical Diagnosis
BLOWER MOTOR INOPERATIVE
TEST FUSE CONTI-
NUITY
PL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Neon

Table of Contents