rtr reaction-configuration test-completion
rtr reaction-configuration test-failure

Scheduling the Probe

rtr schedule
Copyright © 2010, Juniper Networks, Inc.
There is no no version.
See rtr reaction-configuration path-change
Use to enable test-completion reaction.
The test-completion event is triggered when a test is completed successfully.
For echo, a successful test means that all probes were sent.
For pathEcho, a successful test means that the destination was reached at least
once.
At most, there can be one such event per test.
Example
host1(config)#rtr reaction-configuration 1 test-completion
There is no no version.
See rtr reaction-configuration test-completion
Use to enable test-failure reaction.
The test-failure event is triggered when a test fails. Failure is determined in the following
ways:
If Echo, this event is triggered after testFailureValue probes are either not received
or are received after a timeout.
If PathEcho, this event is triggered when the test ends and no responses are received
from the destination.
At most, there can be one such event per test.
Example
host1(config)#rtr reaction-configuration 1 test-failure
There is no no version.
See rtr reaction-configuration test-failure
When you have configured the RTR probe, you must schedule the operation to begin
collecting statistics and other information about problems that may arise.
Use to create an RTR schedule.
Example
host1(config)#rtr schedule 5