TOHATSU MD 30B2 Service Manual page 279

Hide thumbs Also See for MD 30B2:
Table of Contents

Advertisement

29) Installation of PTT Unit/Gas Shock Absorber
1.
Fully tilt up outboard motor and lock with tilt stopper 1.
Be sure to lock outboard motor with tilt
stopper after tilting up. Leaving outboard
m o t o r w i t h o u t l o c k i n g m a y l e a d t o
accidental descent due to reduction of PTT
hydraulic pressure.
2.
Reinstall bushings 2, 3, 4 and 5 to their original
positions.
OBM
OBM
OBM
3.
Install PTT unit 6 or gas shock absorber 7, and then
cylinder shaft (lower) 8.
Retract tilt rod a little.
OBM
OBM
OBM
4.
Attach "C" ring 9.
5.
Connect lead wires to battery to fully stretch tilt rod.
6.
Install cylinder shaft (upper) 0 and tighten bolt q.
OBM
OBM
OBM
7.
Run PTT motor lead wires through hole and secure them
using clamps w and screws e.
8.
Connect ground lead r to PTT unit bottom and secure with
bolt t.
9.
Install thrust rod y.
TLD D30/40/50B2 2013
WARNING
1
q
0
2
3
3
6
5
4
5
Gas Assist
t
r
7
4 5
5
r
t
2 3 4 5 Bushings
6 PTT unit
7 Gas Shock Absorber
8 Cylinder Pin (Lower)
9 "C" Ring
0    Cylinder Pin (Upper)
q Bolt
w Clamps
e Screw
r Ground Lead
t Bolt
y Thrust Rod
w
e
w
e
y
8
9
7
7-49

Advertisement

Table of Contents
loading

This manual is also suitable for:

Md 40b2Md 50b2D40b2zWd50b2

Table of Contents