TOHATSU MD 30B2 Service Manual page 276

Hide thumbs Also See for MD 30B2:
Table of Contents

Advertisement

Cowl, Bracket and PTT Unit
27) Installation of PTT Pump and Motor
1.
Use vise to fix PTT unit 1 that is protected at both sides
with wood pieces or aluminum plates.
2.
Assemble valve ass'y 2, releaf valve ass'y 3 and PTT
pump ass'y 4, and tighten bolt 5 to specified torque.
PTT Pump Bolt :
5.2 N·m ( 3.8 lb·ft ) [ 0.52 kgf·m ]
3.
Install filter 6 to PTT unit.
4.
Install manual valve 7 and tighten to specified torque.
Manual Valve :
1.8 N·m ( 1.3 lb·ft ) [ 0.18 kgf·m ]
4.
Fill pump chamber with PTT fluid to top edge as shown.
Recommended PTT Fluid :
ATF DEXRON III
OIL
5.
Install new o-ring 8, cupling 9 and PTT motor ass'y 0 and
tighten to specified torque.
Screw :
6 N·m ( 4 lb·ft ) [ 0.6 kgf·m ]
7-46
6
3
2
1
0
q
5
4
7
8
9
TLD D30/40/50B2 2013

Advertisement

Table of Contents
loading

This manual is also suitable for:

Md 40b2Md 50b2D40b2zWd50b2

Table of Contents