39) Installation of Air Chamber
1.
Attach reed valve, air chamber and gaskets to crank case.
Attach and tighten securing bolts (M6)
specified torque in the order of the numbers shown.
• Use new gaskets.
• When reusing bolts, apply screw lock #1342.
Air Chamber Bolts (M6)
9 N · m (7 lb · ft) [0.9 kgf · m]
1342
1342
1342
40) Installation of Oil Pump
1.
Install oil pump driven gear 1 and bushing 2 to cylinder
ass'y.
TLD D30/40/50B2 2013
to
(M6) to
1
12
–
:
1
12
1342
1342
1342
1 Gasket
Do not reuse.
1
1
1
1
2
2
5-51
5