TOHATSU MD 30B2 Service Manual page 118

Hide thumbs Also See for MD 30B2:
Table of Contents

Advertisement

Fuel System (TLDI)
11) Installing Air Compressor
Install compressor by using the following steps.
1.
Install compressor slide up into belt and on dowel pins, and
then tighten the bolts to specified torque.
Air Compressor Mounting Bolt 8 :
13N·m (9 lb·ft) [1.3 kgf·m]
Check the knock pin 1, installed to crank case.
2.
Tighten the nut of high pressure air hose 2.
3.
Connect the pipe 3, recirculation pipe 4 and oile pipe 5.
4.
Connect the water temp sensor 6 to compressor.
4-38
1
5
5
3
3
2
2
6
6
4
4
TLD D30/40/50B2 2013

Advertisement

Table of Contents
loading

This manual is also suitable for:

Md 40b2Md 50b2D40b2zWd50b2

Table of Contents