Checking Cable Installation; Checking Signal Cable Installation; Checking Installation Of Power Cables And Grounding Cables; Table 7-2 Check Items For Signal Cables Installation - Huawei BBU3806 Installation Manual

Wcdma base band unit
Table of Contents

Advertisement

Installation Manual – Hardware Installation
BBU3806 WCDMA Base Band Unit

7.3 Checking Cable Installation

This section introduces how to check the installation of:
Signal cables
Power cables
Grounding cables

7.3.1 Checking Signal Cable Installation

Table 7-2 lists the check items after the installation of signal cables.

Table 7-2 Check items for signal cables installation

Serial No.
1
2
4
5
6
7

7.3.2 Checking Installation of Power Cables and Grounding Cables

Table 7-3 lists the check items after the installation of power cables and grounding
cables.

Table 7-3 Check items for power cable and grounding cable installation

Serial No.
1
2
3
The connectors of the signal cable are tight and secure.
The connectors of the signal cable are intact.
The signal cable is neatly bound with ties installed at even intervals,
to a proper tightness, and in the same direction.
Extra cable ties are stripped off. All cut are smooth without sharp
projection
The cables layout allows for easy maintenance and future expansion.
All labels and tags at both ends of the cable are legible. That is, both
ends of the cable shall be labeled.
The PGND cable is yellow and green.
The DC grounding cable is black.
The –48V power cable is blue.
The +24 V power cable is black.
No power cable or PGND cable can be short-circuited or reversely
connected.
The power cable and PGND cable shall be bound separately from
other cables.
Huawei Technologies Proprietary
7-2
Chapter 7 Checking Hardware Installation
Check item
Check item

Advertisement

Table of Contents
loading

Table of Contents