04-500 Main Motor Locked RAP
04-500 The machine has detected that the main BLDC motor is not being controlled.
Procedure
Switch off the electricity to the machine. Disconnect the power cord from the customer
supply while performing tasks that do not need electricity. Electricity can cause death or
injury. Moving parts can cause injury.
Go to the relevant procedure:
4150 Checkout
4250/4260 Checkout
4265 Checkout
4150 Checkout
NOTE: The main PWB has test points. The location of the test points is shown on the
PWB
PJ location illustration.
Refer to
Wiring Diagram
4. Perform the following:
1.
Switch off the machine, then switch on the machine.
2.
Remove the toner cartridge,
PL 9.10 Item
Enter
dC330
code 04-100. Check that the main BLDC motor (MOT04-100),
2
runs.
3.
Check the wiring between the main BLDC motor and CN9 on the
4.
If necessary, install a new main BLDC motor,
5.
Perform the
OF5
Main PWB Check RAP.
4250/4260 Checkout
NOTE: The main PWB has test points. The location of the test points is shown on the
PWB
PJ location illustration.
Refer to
Wiring Diagram
23. Perform the following:
1.
Switch off the machine, then switch on the machine.
2.
Remove the toner cartridge,
PL 9.10 Item
Enter
dC330
code 04-100. Check that the main BLDC motor (MOT04-100),
2
runs.
3.
Check the wiring between the main BLDC motor and CN10 on the
4.
If necessary, install a new main BLDC motor,
5.
Perform the
OF5
Main PWB Check RAP.
4265 Checkout
NOTE: The main PWB has test points. The location of the test points is shown on the
PWB
PJ location illustration.
Refer to
Wiring Diagram
39. Perform the following:
1.
Switch off the machine, then switch on the machine.
2.
Remove the toner cartridge,
PL 9.10 Item
Enter
dC330
code 04-100. Check that the main BLDC motor (MOT04-100),
2
runs.
WorkCentre WorkCentre 4150/4250/4260WorkCentre 4150/4250/42604150/
WARNING
2, then the xerographic module,
PL 9.10 Item
Main
PWB.
PL 4.20 Item
2.
2, then the xerographic module,
PL 9.10 Item
Main
PWB.
PL 4.25 Item
2.
2, then the xerographic module,
PL 9.10 Item
3.
Check the wiring between the main BLDC motor and CN15 on the
4.
If necessary, install a new main BLDC motor,
5.
Perform the
OF5
Main
1.
PL 4.20 Item
Main
1.
PL 4.25 Item
Main
1.
PL 4.25 Item
January 2016
2-25
PL 4.25 Item
Main PWB Check RAP.
Main
PWB.
2.
Status Indicator RAPs
04-500

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workcentre 4250Workcentre 4260Workcentre 4265

Table of Contents