OF2 UI Touch Screen Error RAP
Use this RAP to solve UI touch screen problems when the machine has power but either the
display is missing, is too dark or the UI screen responds incorrectly or does not refresh.
Procedure
Switch off the electricity to the machine. Disconnect the power cord from the customer
supply while performing tasks that do not need electricity. Electricity can cause death or
injury. Moving parts can cause injury.
Go to the relevant procedure:
4150 Checkout
4250/4260 Checkout
4265 Checkout
4150 Checkout
NOTE: The main PWB has test points. The location of the test points is shown on the
PWB
PJ location illustration.
Refer to
Wiring Diagram
3,
Wiring Diagram 8
1.
Make sure that the backlight level is not turned down.
2.
If possible, enter
dC305
UI Test. Perform the relevant tests to check the operation of the
UI.
3.
Remove the UI, refer to
REP
2.1. Check the wiring between the
screen,
PL 2.10 Item
2.
4.
Check the wiring between CN6 on the
5.
Check for +5V and +24V on CN27 on the
perform the following:
Check the wiring between CON71 on
PWB.
Install a new power supply unit 1,
Perform the
OF5
Main PWB Check RAP.
6.
Install new components as necessary:
Touch screen,
PL 2.10 Item
2.
UI assembly,
PL 2.10 Item
1.
7.
Perform the
OF5
Main PWB Check RAP.
4250/4260 Checkout
NOTE: The main PWB has test points. The location of the test points is shown on the
PWB
PJ location illustration.
Refer to
Wiring Diagram
19. Perform the following:
If possible, enter
dC305
UI Test. Perform the relevant tests to check the operation of the
UI.
Remove the UI, refer to
REP
2.2. Check that the ribbon cables between the UI PWB and
the touch screen,
PL 2.12 Item 2
are connected and securely held by the locking mecha-
nism on each connector.
Check the wiring between CN1 on the
WorkCentre 4150/4250/4260WorkCentre WorkCentre 4150/4250/42604150/
WARNING
and
Wiring Diagram
10. Perform the following:
UI PWB
UI PWB
and CN4 on the
Main
PWB.
Main
PWB. If +5V and +24V are not available,
Power Supply Unit 1
and CN27 on the
PL 1.10 Item
3.
UI PWB
and CN2 on the
Main
PWB.
Check for +5V and +24V on CN2 on the
perform the following:
Check the wiring between CON71 on
PWB.
Install a new power supply unit 1,
Perform the
Install new components as necessary:
Touch screen,
UI assembly,
Perform the
OF5
4265 Checkout
NOTE: The main PWB has test points. The location of the test points is shown on the
PWB
PJ location illustration.
Refer to
Wiring Diagram 34, Wiring Diagram 36
Main
If possible, enter
UI.
Remove the UI, refer to
the touch screen,
nism on each connector.
Check the wiring between CN8 on the
Check for +5V and +24V on CN32 on the
and the touch
perform the following:
Check the wiring between CON71 on
PWB.
Install a new power supply unit 1,
Perform the
Main
Install new components as necessary:
Touch screen,
UI assembly,
Perform the
OF5
Main
January 2016
2-101
Main
PWB. If +5V and +24V are not available,
Power Supply Unit 1
PL 1.15 Item
3.
OF5
Main PWB Check RAP.
PL 2.12 Item
2.
PL 2.12 Item
1.
Main PWB Check RAP.
and
:Wiring Diagram 44.
dC305
UI Test. Perform the relevant tests to check the operation of the
REP
2.3. Check that the ribbon cables between the UI PWB and
PL 2.12 Item 2
are connected and securely held by the locking mecha-
UI PWB
and CN5 on the
Main
PWB. If +5V and +24V are not available,
Power Supply Unit 1
PL 1.15 Item
3.
OF5
Main PWB Check RAP.
PL 2.12 Item
2.
PL 2.12 Item
1.
Main PWB Check RAP.
and CN18 on the
Main
Main
Perform the following:
Main
PWB.
and CN33 on the
Main
Status Indicator RAPs
OF2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workcentre 4250Workcentre 4260Workcentre 4265

Table of Contents