•
Check the spring contacts in the terminal assembly,
spring contacts supply the voltages to the xerographic module and the side
cover assembly. If necessary, clean the spring contacts. If necessary, install a
new terminal assembly,
PL 4.15 Item
•
Check the wiring between CON2 on the
4.15 Item
13.
•
Check the wiring between CON1 on the
•
Check the xerographic module ground connector,
that the connector is grounded.
•
Install a new HVPS,
PL 1.15 Item
•
Install a new side cover assembly,
i.
(4265) Refer to
Wiring Diagram 34.
•
Check the spring contacts in the terminal assembly,
spring contacts supply the voltages to the xerographic module and the side
cover assembly. If necessary, clean the spring contacts. If necessary, install a
new terminal assembly,
PL 4.15 Item
•
Check the wiring between CON2 on the
4.15 Item
13.
•
Check the wiring between CON1 on the
•
Check the xerographic module ground connector,
that the connector is grounded.
•
Install a new HVPS,
PL 1.15 Item
•
Install a new side cover assembly,
j.
Perform the
OF5
Main PWB Check RAP.
WorkCentre WorkCentre 4150/4250/4260WorkCentre 4150/4250/42604150/
PL 4.15 Item
13.
HVPS
and the terminal assembly,
HVPS
and CN7 on the
Main
PWB.
PL 4.15 Item
26. Make sure
2.
PL 7.30 Item
1.
Perform the following:
PL 4.15 Item
13.
HVPS
and the terminal assembly,
HVPS
and CN13 on the
Main
PWB.
PL 4.15 Item
26. Make sure
2.
PL 7.30 Item
1.
13. The
IQ3 Black Copies or Prints RAP
Use this RAP when the machine produces black copies and prints.
Procedure
PL
Switch off the electricity to the machine. Disconnect the power cord from the customer
supply while performing tasks that do not need electricity. Electricity can cause death or
injury. Moving parts can cause injury.
Go to the relevant procedure:
•
4150 Checkout
•
4250/4260 Checkout
•
4265 Checkout
13. The
4150 Checkout
Refer to
Wiring Diagram
3. Perform the following:
1.
Make a print, make a copy. If the print and copy are both black, go to the
PL
Error RAP.
2.
Check the ribbon cable,
PWB. If necessary, install a new CCD ribbon cable,
3.
Refer to
Wiring Diagram
nal assembly,
PL 4.15 Item
4.
If the machine prints a black configuration page, perform the following:
a.
dC132
NVM Initialization.
b.
Check the memory DIMM,
DIMM.
c.
Perform
GP 19
Memory Clear.
5.
Install new components as necessary:
•
CCD module,
PL 14.10 Item
•
HVPS,
PL 1.10 Item
6.
Perform the
OF5
Main PWB Check RAP.
4250/4260 Checkout
Refer to
Wiring Diagram
21. Perform the following:
1.
Make a print, make a copy. If the print and copy are both black, go to the
Error RAP.
2.
Check the ribbon cable,
PWB. If necessary, install a new CCD ribbon cable,
3.
Refer to
Wiring Diagram
nal assembly,
PL 4.15 Item
4.
If the machine prints a black configuration page, perform the following:
a.
dC132
NVM Initialization.
b.
Check the memory DIMM,
DIMM.
c.
Perform
GP 19
Memory Clear.
5.
Install new components as necessary:
•
CCD module,
PL 14.13 Item
January 2016
3-9
WARNING
PL 14.10 Item 7
between the CCD module and CN3 on the
PL 14.10 Item
2. Check the wiring between CON1 on the
13.
PL 1.10 Item
22. If necessary, install a new memory
2.
2.
PL 14.13 Item 7
between the CCD module and CN3 on the
PL 14.13 Item
18. Check the wiring between CON2 on the
13.
PL 1.15 Item
22. If necessary, install a new memory
2.
06-100, 200
LSU
Main
7.
HVPS
and the termi-
06-100, 200
LSU
Main
7.
HVPS
and the termi-
Image Quality
IQ2, IQ3