2 Installation
Redundant Ground for 400 Hz Operation
At 400 Hz AC input operation, the leakage current of the unit exceeds 3.5 mA. This requires the
installation of a permanent, redundant ground from the instrument chassis to earth ground. This
ensures that ground will always be connected and that any leakage current will be diverted to ground.
Refer to
BNC Connectors
later in this section for installation instructions.
Refer to the
Specifications
section for power factor statistics at 400 Hz operation.
54
Keysight N6705C Operating and Service Guide