MacDon M150 2008 Operator's Manual page 99

Self-propelled windrower
Table of Contents

Advertisement

h. Disconnect center link as follows:
MECHANICAL LINK – M150
J
1. Loosen nut (G) and rotate barrel (H) to
relieve load on link.
2. Remove cotter pin on pin (J), and remove
pin to disconnect from header. Re-install pin
in header.
HYDRAULIC LINK – M200 STD, M150 OPTION
M
L
1. Activate header tilt cylinder switch on GSL to
release load on center link cylinder (K).
2. Lift hook release (L) and lift hook (M) off
header pin.
If optional center link lift cylinder is
installed, lift release (L) and then operate
the link lift cylinder from the cab to
disengage the center link from the header.
Form 169017
HEADER OPERATION – A SERIES
H
G
K
NOTE
i.
Disconnect header drive hydraulics (N) and
electrical harness (O).
Header Operator's Manual.
j.
Slowly back tractor away from header.
B
k. Re-install pins (A) in header boots (B).
97
O
N
Refer to the Auger
A
Issue – June 2008

Advertisement

Table of Contents
loading

This manual is also suitable for:

M200 2008M150M200

Table of Contents