Installing The Library; Verify The Site Meets Environmental Requirements; Airborne Contaminants Limits - StorageTek SL150 Manual

Modular tape library
Table of Contents

Advertisement

Library installation involves the following tasks:

Verify the Site Meets Environmental Requirements

Prepare the Rack
Unpack and Acclimate the Library
Install the Base Module
Install the Expansion Module
Install Power Supplies and Tape Drives
Cable the Library
Unlock the Robot
Apply Power to the Library
Configure the Library After Powering-on for the First Time
Run a Self-Test
Verify the Site Meets Environmental Requirements
For optimal reliability, maintain the environment between the recommended ranges.
Temperature:
Operating: +10° to +40°C (+50° to +104°F)
Non-operating -40° to +60°C (-40° to +140°F)
Relative Humidity:
Operating: 20% to 80% (40% to 50% recommended) non-condensing
Non-operating: 10% to 95% non-condensing

Airborne Contaminants Limits

Airborne particulates can damage equipment. The operating environment for the
library must meet to the following requirements:
These installation instructions use the Sun Rack II (a
Note:
standard Oracle 19-inch rack). If your rack is different, use the
instructions as a basic guide but alter the steps accordingly.

Installing the Library

2
Installing the Library 2-1
2