Library installation involves the following tasks:
Verify the Site Meets Environmental Requirements
■
Prepare the Rack
■
Unpack and Acclimate the Library
■
Install the Base Module
■
Install the Expansion Module
■
Install Power Supplies and Tape Drives
■
Cable the Library
■
Unlock the Robot
■
Apply Power to the Library
■
Configure the Library After Powering-on for the First Time
■
Run a Self-Test
■
Verify the Site Meets Environmental Requirements
For optimal reliability, maintain the environment between the recommended ranges.
Temperature:
Operating: +10° to +40°C (+50° to +104°F)
■
Non-operating -40° to +60°C (-40° to +140°F)
■
Relative Humidity:
Operating: 20% to 80% (40% to 50% recommended) non-condensing
■
Non-operating: 10% to 95% non-condensing
■
Airborne Contaminants Limits
Airborne particulates can damage equipment. The operating environment for the
library must meet to the following requirements:
These installation instructions use the Sun Rack II (a
Note:
standard Oracle 19-inch rack). If your rack is different, use the
instructions as a basic guide but alter the steps accordingly.