Validate The Component Installation; Cable Attachment - StorageTek SL150 Manual

Modular tape library
Table of Contents

Advertisement

Figure 10–8 Cable Attachment
Illustration Legend:
1 - Tape Drive With Fibre Channel Cable
2 - Expansion Module Cable
3 - Ethernet Cable
4 - Power Supply Cord
5 - Tape Drive With SAS Cable
Connect the power cord to each installed power supply.
3.
Follow the power on procedures (see
4.
page 10-19).

Validate the Component Installation

Power on the library (see
1.
Check the OK indicators on all CRUs.
2.
Verify that the library health state is operational from either the touch screen or the
3.
remote interface (see
If the health state is degraded or failed, see
to assist with resolving the problem.
Perform an operational check of replaced CRUs, as applicable:
4.
Run the offline self tests from the remote interface (see
5.
page 2-36).
Set the library to the online state (see
6.
page 9-1) and log out of the remote interface.
Run host application commands to ensure that the library and drive applications
7.
are synchronized. See your host tape application documentation for guidance.
"Power On the Library"
"View the Library State"
Front Panel — Test the panel for general operation (locate light, touch screen,
open the mailslot, and so forth).
Module Controller — Confirm that the library recognizes the module
controller (Modules area of the touch screen or Library area of the SL150
remote interface).
Validate the Component Installation
"Validate the Component Installation"
on page 9-2).
on page 7-1).
"Troubleshoot the Library"
"Run a Self-Test"
"Place the Library Online and Offline"
Replacing Components (CRUs & FRUs) 10-19
on
on page 9-6
on
on

Advertisement

Table of Contents
loading

Table of Contents