GT2512F-S, GT2510F-V, GT2508F-V
Depending on the units and cables used for the GOT, the distance more than the described dimensions may be required.
Install the GOT with consideration of the connector dimensions and the cable bend radius.
For the cable pull-out distance from the bottom of the GOT, refer to the following.
Page 415 Cable Bend Radius for GT25 with an Extension Unit
For the vertical installation, install the GOT so that the vertical installation arrow printed on the GOT rear face points upward.
Page 126 GT25-S, GT25-V
D
Back of the Horizontal
A
Back of the Vertical
6 INSTALLATION AND REMOVAL
188
6.4 Installation Position
B
A
D
B
C
Panel thickness: 1.5 mm to 4 mm
C
E
Panel thickness: 1.5 mm to 4 mm
(0.06 to 0.16inch)
E
(0.06 to 0.16inch)