CC-Link IE TSN connection
Strip off the sheath at both ends of the cable as shown in the figure below to expose braided shield for grounding.
The braided shield sections are used for grounding with a cable clamp.
Page 164 Grounding a cable
GOT side
40
230 or less
(9.06)
(1.57)
CC-Link IE Field Network connection
1.
Strip off the sheath at both ends of the cable as shown in the figure below to expose braided shield for grounding.
The braided shield sections are used for grounding with a cable clamp.
Page 164 Grounding a cable
2.
Install a ferrite core to the cable in the positions as shown in the figure below.
GOT side
120
or less
(4.72)
40
230 or less
(9.06)
(1.57)
40
(1.57)
Ferrite core (ZCAT3035-1330)
40
(1.57)
Controller side
400 or less
Unit: mm (inch)
(15.75)
Controller side
400 or less
Unit: mm (inch)
(15.75)
5 EMC DIRECTIVE AND LOW VOLTAGE DIRECTIVE
5.2 EMC Directive Requirements
5
159