Mitsubishi Electric GOT2000 Series Hardware User Manual page 274

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

Installation (GT16H-CNB-42S)
The connector conversion box can be installed on the panel face directly or on the DIN rail.
■Mounting on the panel face (When setting the connector for Handy GOT connection and the
power supply switch on the panel surface)
1.
Open an installation hole on the control panel with the dimensions shown below.
4-R3 (0.12)max
(Panel opening)
2.
Install the accessory packing to the packing attachment chase of the connector conversion box.
Be sure to install the packing.
Packing attachment chase
7 OPTION AND COMMUNICATION CABLE FOR HANDY GOT
272
7.1 Connector Conversion Box
Drill 4- 5±0.5 (0.2±0.02)
77±0.5 (3.04±0.02)
61+1,-0 (2.41±0.04 ,-0 )
(Panel opening)
Elevation view
Panel cut area
Unit: mm (inch)

Advertisement

Table of Contents
loading

Table of Contents