Mitsubishi Electric GOT2000 Series Hardware User Manual page 288

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

6.
Set the project data to use the station No. switching.
Select [Screen] → [Screen Property] from the menu to display the [Screen Property] dialog.
Tick the check box of [Switch Station No.] in the [Basic] tab.
Perform this operation in all screens where the station No. is switched.
7.
Place objects on the screen.
Finally, place objects on the screen.
Select [Host] for [Network].
When the station No. switching device value is 0, the host is monitored.
Transfer the project data to the GOT and check the operation.
7 OPTION AND COMMUNICATION CABLE FOR HANDY GOT
286
7.1 Connector Conversion Box

Advertisement

Table of Contents
loading

Table of Contents