Mitsubishi Electric GOT2000 Series Hardware User Manual page 298

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

Installing a connector conversion box (GT11H-CNB-37S)
Install a connector conversion box on the panel directly or with a mounting bracket.
■Installing a connector conversion box on the panel (the Handy GOT connector accessible
through the panel opening)
1.
Open installation holes on the panel with the dimensions shown below.
(2.52      )
64
±0.5
2.
Fit the connector conversion box into the installation holes from the back side of the panel, and fix the box with M3
screws (prepared by user).
In the connector conversion box, thread of M3, 6 mm in depth is cut in each mounting hole.
Prepare four M3 mounting screws separately while considering the thickness of the panel face.
Tighten the screws within the specified torque range (0.49 N•m to 0.68 N•m).
Overtightening the screws may cause damage.
To connect a PLC connection cable, make sure that no object is located within 100 mm from the bottom side of the connector.
Keep a space of 25 mm or more on both sides of the connector conversion box.
M3 screw x 4 pcs
(prepared by user)
7 OPTION AND COMMUNICATION CABLE FOR HANDY GOT
296
7.1 Connector Conversion Box
+0.02
 0
+0.5
(0.14      )
Drill
4-Φ3.5
 0
Panel cut area
+1
+0.04
28
(1.1      )
 0
 0
Unit: mm (inch)
(Panel opening)
+0.02
 0
Thread depth 
6 (0.23)
100 (3.93)
Panel face
25
(0.98)
Unit: mm (inch)
25
(0.98)

Advertisement

Table of Contents
loading

Table of Contents