Connecting A Monitoring Cable To A Netcol5000-C030 - Huawei IDS2000 Dual-Row Aisle Containment Installation Manual

Split-type skylight, old-version sliding door
Hide thumbs Also See for IDS2000 Dual-Row Aisle Containment:
Table of Contents

Advertisement

IDS2000 Dual-Row Aisle Containment
Installation Guide (Split-type Skylight, Old-Version
Sliding Door)
Type of the Collector
Connected
ECC collector
Step 2 Connect the RJ45 connector of the RS485 monitoring cable to the RS485 port on the CCU
collector or ECC collector.
----End

10.12.31 Connecting a Monitoring Cable to a NetCol5000-C030

Prerequisites
Procedure
Step 1 Connect one end of the network cable to J73 communications port 1 or 2 on the
NetCol5000-C030 main control board, and flip toggle switches 3 and 4 of DIP switch S1 to
ON.
Figure 10-69 NetCol5000-C030 main control board
(1) Teamwork communication & Monitoring communication port J73
Issue 02 (2015-06-30)
A network cable used for monitoring has been prepared.
You are familiar with the functions of all ports on the CCU collector by referring to
10.12.2 Port Description for the CCU
You are familiar with the functions of all ports on the ECC collector by referring to
10.12.3 Port Description for the ECC
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Wiring Terminal in the
RS485 Port
+
-
Collector.
Collector.
10 Cable Layout
Color of Core Wire in the
Cord End Terminal
Orange and white
Orange
(2) DIP switch S1
238

Advertisement

Table of Contents
loading

Table of Contents