Figure 6-2 PDU2000 cables layout on the top of cabinet
(1) Weak-current cable trough
Procedure
Step 1 Keep a bracket of a cable trough at the same level as a cabinet roof, and insert the clasps of
the bracket into the fifth row of holes counting from the front door to the rear door, as shown
in
Figure
Issue 02 (2015-06-30)
out to the open area of the cable trough. After the cable trough close to the rear door is
installed, place the PDU2000 cables and industrial connectors in the cable trough close
to the front door. See
Figure
Hot aisle containment: After the cable trough close to the front door of the cabinet is
installed, place the PDU2000 cables and industrial connectors in the cable trough close
to the front door.
After the PDU2000 cables and industrial connectors are placed, secure the cables to the
top frame of the cabinet.
6-3.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6-2.
(2) Strong-current cable trough
6 Installing Cable Troughs
94