Figure 2-6
Figure 2-6 Space requirement for a dual-row containment (unit: mm)
Procedure
Step 1 Position the cabinet, as shown in
1.
2.
3.
Issue 02 (2015-06-30)
shows the space requirements for a modular data center.
Use a level to check the floor levelness.
Measure the distances by using a measuring tape, and mark lines by using a marker.
Check the cabinet levelness by using a level.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
2-7.
2 Installing Cabinets