Procedure
Step 1 Tighten the screws securing the door posts and skylight connective plates. For details, see
Figure 3-41
Step 2 Secure the posts to the floor using the self-drilling screws delivered with the door panels.
----End
Installing Guide Rails for Door Closer
Procedure
Step 1 Remove the rear panel from the skylight sealing kit, as shown by 1 in
Figure 3-47 Front view of the skylight sealing kit
Figure 3-48 Rear of the skylight sealing kit
Step 2 Remove the guide rail sealing kit from the bottom of the skylight sealing kit, as shown by 2 in
Figure
Step 3 Smear lubricant on the inner side wall of the closer guide rail. You can use the lubricant
delivered with the guide rail fittings.
Step 4 Place the guide rail into the installation space, as shown by 3 in
the skylight sealing kit using four screws. Ensure that the end with springs is secured to the
end that is to be connected to the door post, as shown in
Issue 02 (2015-06-30)
in
Installing a Door
3-48. The space for installing the guide rail is exposed, as shown by 3 in
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Installation Scenarios in Dual Row Aisle Containment
Frame.
Figure
3-48.
Figure
3-48, and secure it to
Figure
3-49.