Installing Cable Trays In Scenarios With Columns - Huawei IDS2000 Dual-Row Aisle Containment Installation Manual

Split-type skylight, old-version sliding door
Hide thumbs Also See for IDS2000 Dual-Row Aisle Containment:
Table of Contents

Advertisement

IDS2000 Dual-Row Aisle Containment
Installation Guide (Split-type Skylight, Old-Version
Sliding Door)
Step 3 Put base B upside down and secure base B to the fixing plate on the top of the cabinet using
M8 x 20 bolt assemblies, as shown in
Figure 5-10 Turning base B upside down and securing it
Step 4 Place the cable ladder on bases. The distance between the cable ladder front and the base front
is 535 mm.
Step 5 Secure the cable ladder to bases using conversion brackets and M8 x 20 bolt assemblies.
Step 6 Connect a ground cable between the M8 ground bolt of the cable ladder and the M6 ground
bolt of a base.
Step 7 Connect bases to the M6 ground screws in the cabinets using ground cables.
----End

5.3 Installing Cable Trays in Scenarios with Columns

Context
The BOM numbers of cable trays for scenarios with columns and 390 mm high cable trays are
the same.
Procedure
Step 1 Connect ground cables to a cable tray.
Step 2 Move the cable tray onto cabinets. For details about how to install the cable tray, see
Installing 390 mm High Cable Trays (for 2 m and 2.2 m High Cabinets)
mm High Cable Trays (for 2.2 m High
height.
----End
Issue 02 (2015-06-30)
Figure
Cabinets). Select cable trays based on the cabinet
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5-10.
5 Installing Cable Trays
5.1
and
5.2 Installing 190
92