Figure 9-12 Installing an ECC collector
Step 4 Install a power cable between the ECC and the PDU2000.
----End

9.1.5 Installing an NVR

Procedure
Step 1 Install the floating nuts by referring to
Step 2 Install the NVR in the cabinet using the mounting ears. Perform the same steps to install the
NVR as installing the ECC collector. For details, see
----End

9.1.6 Installing and Connecting Monitoring Components

Install monitoring components to specified holes on the control skylight panel, as shown in
Figure
Issue 02 (2015-06-30)
If an optional static transfer switch (STS) is installed, connect the ECC power cable to the STS to obtain
power if possible.
9-13.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Step 1
in
9.1.1 Installing the
9.1.4 Installing an ECC
9 Installing Auxiliary Devices
RH2288.
Collector.
135

Advertisement

Table of Contents
loading

Table of Contents