Connecting Monitoring Cables To A Wcon-22Z Skylight Controller - Huawei IDS2000 Dual-Row Aisle Containment Installation Manual

Split-type skylight, old-version sliding door
Hide thumbs Also See for IDS2000 Dual-Row Aisle Containment:
Table of Contents

Advertisement

IDS2000 Dual-Row Aisle Containment
Installation Guide (Split-type Skylight, Old-Version
Sliding Door)
Figure 10-49 Cable connection for the NetEco (CCU collector)
Figure 10-50 Cable connection for the NetEco (ECC collector)
10.12.9 Connecting Monitoring Cables to a WCON-22Z Skylight
Controller
Prerequisites
Issue 02 (2015-06-30)
A monitoring cable has been prepared.
You are familiar with the functions of all ports on the CCU collector by referring to
10.12.2 Port Description for the CCU
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Collector.
10 Cable Layout
208

Advertisement

Table of Contents
loading

Table of Contents