9.1 Installing Monitoring Components

9.1.1 Installing the RH2288

Procedure
Step 1 Determine the collector mounting holes in the network cabling cabinet according to the
engineering drawing. Secure one floating nut to each rack rail of the cabinet by using a
floating nut mounting bar, as shown in
Figure 9-1 Installing a floating nut
Step 2 Install guide rails, as shown in
Issue 02 (2015-06-30)
9

Installing Auxiliary Devices

If no floating nut mounting bar is available, using a flat-head screwdriver instead.
Ensure that the floating nuts are at the same level.
Install the server by using the special floating nuts packaged with the RH2288.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
9-1.
Figure
9-2.
9 Installing Auxiliary Devices
127

Advertisement

Table of Contents
loading

Table of Contents