Context
(1) Water detector
(4) Conversion cable end B,
connecting to the water detection
cable
Procedure
Step 1
Figure 9-25
Issue 02 (2015-06-30)
A water sensor consists of a water detection cable, water detector, and conversion cable.
The water detection cable is laid out on the floor, connected to the water detector placed
near the collector by the conversion cable.
Figure 9-24 Water sensor components
Lay out the water detection cable as follows:
For air supplied from under the floor: Lay out the cable around the air conditioner
cofferdam.
For air supplied horizontally: Lay out the cable on the floor around the modular
data center.
Choose a proper installation place for the water detection cable based on site
requirements.
shows how to connect the water detection cable to the conversion cable.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure 9-24
shows the components.
(2) Conversion cable end A,
connecting to the water detector
(5) Water detection cable end A,
connecting to the conversion cable
9 Installing Auxiliary Devices
(3) Conversion
cable
(6) Water
detection cable