Huawei IDS2000 Dual-Row Aisle Containment Installation Manual page 30

Split-type skylight, old-version sliding door
Hide thumbs Also See for IDS2000 Dual-Row Aisle Containment:
Table of Contents

Advertisement

IDS2000 Dual-Row Aisle Containment
Installation Guide (Split-type Skylight, Old-Version
Sliding Door)
Cabinet combination in the 2000 mm scenario
Prerequisites
This section applies to a module that is 2000 mm high. The air conditioner can be directly
combined with an adjacent cabinet without the need of a top frame.
Procedure
Step 1 Use a combining bar to pull the cabinets adjacent to the air conditioner tightly, as shown in
Figure
Figure 2-21 Combining cabinets
----End
Cabinet combination in the 2200 mm scenario
Prerequisites
If pipes are routed on top of a 2200 mm high air conditioner, ensure that the two 300 mm long
straight copper pipes are welded to the top of the air conditioner before installation. This
prevents the problem of installing copper pipes after the top frame of the air conditioner is
installed.
Issue 02 (2015-06-30)
2-21.
This step applies only to the APC or Emerson air conditioners.
Do not remove the top panels of the cabinets adjacent to the air conditioner.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 Installing Cabinets
22

Advertisement

Table of Contents
loading

Table of Contents