Inrush Current; Site Circuit Breaker; Site Power Outlets; Unit Power Plug - GE LOGIQ P3 PRO Service Manual

Table of Contents

Advertisement

GE
D
5308917-100, R
IRECTION
2-2-2-2

Inrush Current

Inrush current is not a factor to consider due to the inrush current limiting properties of the power
supplies.
2-2-2-3

Site Circuit Breaker

It is recommended that the branch circuit breaker for the machine be readily accessible.
2-2-2-4

Site Power Outlets

A dedicated AC power outlet must be within reach of the unit without extension cords. Other adequate
outlets for the external peripherals, medical and test equipment needed to support this unit must also
be present within 1 m (3.2 ft.) of the unit. Electrical installation must meet all current local, state, and
national electrical codes.
2-2-2-5

Unit Power Plug

If the unit arrives without a power plug, or with the wrong plug, you must contact your GE dealer or the
installation engineer must supply what is locally required.
2-2-2-6

Power Stability Requirements

Voltage drop-out
Max 10 ms.
Power Transients
(All applications)
Less than 25% of nominal peak voltage for less than 1 millisecond for any type of transient, including
line frequency, synchronous, asynchronous, or aperiodic transients.
2-4
PROPRIETARY TO GE
8
EVISION
Section 2-2 - General Console Requirements
LOGIQ P3 S
M
ERVICE
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logiq p3 bt10Logiq p3Logiq p3 expertLogiq p3 vet

Table of Contents