Receiving And Unpacking The Equipment - GE LOGIQ P3 PRO Service Manual

Table of Contents

Advertisement

GE
D
5308917-100, R
IRECTION
Section 3-2

Receiving and Unpacking the Equipment

When a new system arrives, check that any components are not damaged and are not in short supply.
If shipping damage or shortage occurs, contact the address shown in Chapter 1.
The Packaging/Unpacking Procedure.
Topics discussed in the Packaging/Unpacking Procedure:
1.) Check the Shipment
2.) Unpack the Unit
3.) Handling Incomplete or Damaged Shipment
Please read these procedures before packing/unpacking the LOGIQ P3.
We strongly advice you to store the LOGIQ P3 packing material in undamaged condition in case of
future transportation.
Do not lift the unit by the Keyboard. This may cause equipment damage.
CAUTION
The crate with the LOGIQ P3 weighs approximately 80 kg. Be prepared for a sudden shift of
CAUTION
weight as the unit is removed from its base (pallet).
Inspect the Shcik watch and Tilt watch. Ensure that they are not fused. (Refer to the instructions
CAUTION
attached on the packing Box on howto check the Shcik watch and Tiltwatch)
1.) Cut the two Metal Bands.
PROPRIETARY TO GE
8
EVISION
Figure 3-1 Cutting the two metal bands.
Chapter 3 Installation
LOGIQ P3 S
M
ERVICE
ANUAL
3-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logiq p3 bt10Logiq p3Logiq p3 expertLogiq p3 vet

Table of Contents