Scanner Shutdown; Full Maintenance Reboot (Logiq P3) - GE LOGIQ P3 PRO Service Manual

Table of Contents

Advertisement

GE
D
5308917-100, R
IRECTION
4-3-2-1
TMST Power Down (cont'd)
4.) The shutdown process takes 15 seconds and the power off sequence is complete when the power
status LED is turned Amber.
5.) Disconnect the probes.Clean or disinfect all probes as necessary. Store them in their shipping
cases to avoid damage.
4-3-2-2

Scanner Shutdown

Disconnect the Mains Power Cable is necessary. For example: Relocating the scanner.
DO NOT unplug and/or transport the unit until after the power off sequence has been completed.
CAUTION
Failure to do so may result in corrupted patient files.
4-3-2-3

Full Maintenance Reboot (LOGIQ P3)

Full Maintenance Reboot will fully restart the whole system for performance improvement.
1.) Press the Power On/Off switch at the front of the system once.
2.) Click "Shutdown".
3.) Full Maintenance Reboot dialog is displayed.
4.) During Full Maintenance the pop up window will two options "Ok" and "Cancel" press cancel for
Normal shutdown (Hibernate) and Ok for Shutdown.
4-4
PROPRIETARY TO GE
8
EVISION
Figure 4-3 "Full Maintenance Reboot" dialog
Section 4-3 - General Procedure
LOGIQ P3 S
M
ERVICE
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logiq p3 bt10Logiq p3Logiq p3 expertLogiq p3 vet

Table of Contents