Toro Groundsmaster 5900 Series Service Manual page 434

Hide thumbs Also See for Groundsmaster 5900 Series:
Table of Contents

Advertisement

Front Deck Lift Arm Installation
Chassis: Service and Repairs
(Figure
g298852
1.
Operator platform
2.
Shim pad
3.
Bumper pad
9. When lift arms are fully raised, check that gap between lift arms and bumper
pads on bottom of operator platform is no greater than 1.5 mm (0.06 in)
(Figure
301). If necessary, add or remove shim pads so that gap is correct.
10. Verify correct operation of front deck position switch and adjust as necessary
(see
Cutting Deck Position Switch Adjustment (page
11. Check blade rake and adjust rear chains as necessary (see machine
Operator's Manual − Front Deck Leveling).
12. Check height−of−cut adjustment and adjust if necessary (see machine
Operator's Manual).
299) (continued)
Figure 301
4.
Flange head screw
5.
Flange nut
Page 7–20
6–46)).
Groundsmaster
®
5900 & 5910
16227SL Rev B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Groundsmaster 5910 series

Table of Contents