Toro Groundsmaster 5900 Series Service Manual page 227

Hide thumbs Also See for Groundsmaster 5900 Series:
Table of Contents

Advertisement

Cutting Deck Control Manifold Installation
Groundsmaster
®
5900 & 5910
16227SL Rev B
4
102 N·m
(75 ft−lb)
34 N·m
(25 ft−lb)
g288134
1.
LH control manifold
2.
Dust cap
3.
Diagnostic fitting
1. If fittings were removed from manifold:
A. Lubricate new O−rings with clean hydraulic oil. Install lubricated O−rings
on fittings.
B. Install fittings into manifold openings using marks made during the
removal process to properly orientate fittings.
C. Tighten hydraulic fittings to torque value provided
and
Figure
113). For information on tightening procedures for hydraulic
fittings, see
Installing the Hydraulic Fittings (SAE Straight Thread O-Ring
Fittings) (page
2. Position PTO control manifold to the frame and secure with two (2) cap
screws, flat washers and flange nuts.
3. Remove caps and plugs from fittings and hoses. Properly connect hydraulic
lines to manifold (see
Seal) (page
5–7)).
4. Connect wire harness connector to the proportional relief valve solenoid.
5. Make sure hydraulic tank is full. Add correct oil if necessary.
6. Check hydraulic system for leaks before returning the machine to service.
(Figure
110) (continued)
102 N·m
(75 ft−lb)
5
1
6
Figure 113
LH Deck Control Manifold
4.
Hydraulic 90º fitting (3)
5.
Straight fitting
6.
Hydraulic 90º fitting
5–9).
Installing Hydraulic Hoses and Tubes (O-Ring Face
Page 5–127
2
34 N·m
(25 ft−lb)
3
102 N·m
(75 ft−lb)
4
(Figure
111,
Figure 112
Hydraulic System: Service and Repairs

Advertisement

Table of Contents
loading

This manual is also suitable for:

Groundsmaster 5910 series

Table of Contents