Toro Groundsmaster 5900 Series Service Manual page 413

Hide thumbs Also See for Groundsmaster 5900 Series:
Table of Contents

Advertisement

Installation (continued)
Groundsmaster
®
5900 & 5910
16227SL Rev B
g298627
1.
24 Volt alternator
2.
Hardened washer (8)
3.
Plastic isolator (4)
2. Install the alternator to the mounting brackets as shown
sure the plastic washers fit over the plastic isolators
3. Use the clearance in the alternator mounting holes to align the alternator
drive pulleys and tighten the four (4) alternator mounting screws from 41
to 49 N·m (30 to 36 ft−lb).
4. Install the alternator drive belt (see
Compressor Drive Belt (page
5. Connect the four (4) wire harness connectors to the alternator
6. Turn the battery−disconnect switch to the ON position before returning the
machine to service.
Figure 288
4.
Alternator mounting bracket
5.
Plastic washer (4)
24 Volt Alternator/Air Conditioning
6–147)).
Page 6–151
(Figure
286). Make
(Figure
288).
(Figure
Electrical System: Service and Repairs
287).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Groundsmaster 5910 series

Table of Contents