Toro Groundsmaster 5900 Series Service Manual page 410

Hide thumbs Also See for Groundsmaster 5900 Series:
Table of Contents

Advertisement

Installation
Electrical System: Service and Repairs
g288687
1.
Drive belt (GM 5900)
2.
Drive belt (GM 5910)
3.
Tensioner assembly
1. Install drive belt over pulleys.
2. Rotate the large hex at the base of the drive belt tensioner until the base
contacts the roll pin
belt tensioner to the frame (item 11) from 37 to 45 N·m (27 to 33 ft−lb).
3. Turn the battery−disconnect switch to the ON position before returning the
machine to service.
2
1
Figure 285
4.
Large hex (at tensioner base)
5.
Roll pin
(Figure
285). Tighten the cap screw securing the drive
Page 6–148
3
4
5
Groundsmaster
®
5900 & 5910
16227SL Rev B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Groundsmaster 5910 series

Table of Contents