2 Installation
2.6.3 Fitting the cable package IRBDP SW6 LE (Lean ID)
Continued
Fitting in base and frame
1
2
3
Continues on next page
104
Action
Fit the cable package in the ball joint
housing on the lower bracket.
Note
Be careful not to lose the small o-ring! The
purpose of the o-ring is to keep the screws
in place in the housing, upper part.
Remove the part of the backplate where
the customer and process plates are sup-
posed to be fitted. Hit the removable part
with a plastic mallet or similar without
damaging other parts of the backplate.
Note
Only needed when the DressPack cable
package is fitted for the first time.
Fit the customer plate and process plate.
© Copyright 2014-2017 ABB. All rights reserved.
Note
xx1200000053
Screw dimension:
•
M6x40 8.8-A2F (2 pcs)
xx1300002317
Left
Customer plate
Right
Process plate
xx1400001145
Screw dimension:
•
M6x16 8.8-A2F (4+4 pcs)
Product manual - DressPack/SpotPack IRB 6700
3HAC044270-001 Revision: F