Ferrari 458 Italia Technical Documentation Manual page 553

Hide thumbs Also See for 458 Italia:
Table of Contents

Advertisement

Refitting the complete engine
Using a mobile hydraulic hoist with a minimum load
capacity of 300 Kg, position the lift hook over the
engine.
Use a suitable strap (39) to fasten the hook
(AV
3979) to the hoist.
Using two suitably sized straps (41) and carabiners,
connect the hook
(AV
3979) to the brackets
(AV
8252) fastened previously to the exhaust
stud bolts.
Using a suitably sized strap (42) and carabiners,
connect the lift tool
(AV
previously onto the stud bolts to the hydraulic
hoist.
Lift the engine, ensuring that the strap tension is
uniform and that the engine itself lifts evenly.
When installing the engine, work with due
CAUTION to prevent any of the engine's
components - and the engine oil pump, the
variable timing adjuster control solenoid
valves and the mounting brackets for the
secondary air pipes mounted on the cylinder
heads in particular - from colliding with the
chassis.
Lift the engine and place in its relative seat on the
engine mounting bushes, but without allowing
the bushes to take up the weight of the engine.
Page 3 of 30
3432) mounted

Advertisement

Table of Contents
loading

Table of Contents