Siemens Sinamics G120P Operating Instructions Manual page 100

Converter cabinet units 110 kw - 400 kw
Hide thumbs Also See for Sinamics G120P:
Table of Contents

Advertisement

Electrical installation
4.8 Signal connections
Position
The position of the terminal block X9 within the cabinet unit is indicated in the following
diagram.
Figure 4-22
Position of the X9 terminal block
100
Inverter cabinet units
Operating Instructions, 12/2014, A5E32923362A

Advertisement

Table of Contents
loading

Table of Contents