Siemens Sinamics G120P Operating Instructions Manual page 40

Converter cabinet units 110 kw - 400 kw
Hide thumbs Also See for Sinamics G120P:
Table of Contents

Advertisement

Mechanical installation
3.3 Assembly
Checking the shipping and handling monitors prior to commissioning
It is essential to check the shipping and handling monitors prior to commissioning the
inverter.
Figure 3-4
The tilt indicator provides immediate visible evidence of whether the cabinet units have been
handled and stored upright. Blue-colored quartz sand begins to flow into the arrow-shaped
indicator area. The tilt indicator has tripped when the blue color extends beyond the middle
line of the arrowhead.
Figure 3-5
The shock indicator shows if an acceleration has exceeded 98.1 m/s
the direction of acceleration. The black color of the arrows indicates that an impermissible
shock load has occurred in the direction of the arrow.
Danger to life caused by device damage during tripped shock or tilt indicators
If a shock or tilt indicator has been tripped, safe operation of the device cannot be
guaranteed.
This can result in death, serious injury or material damage.
• Terminate the commissioning if one of the shock or tilt indicators has been tripped.
• Contact Technical Support immediately for clarification.
40
Tilt indicator tripped
Shock indicator tripped
WARNING
(10 x g) and indicates
2
Inverter cabinet units
Operating Instructions, 12/2014, A5E32923362A

Advertisement

Table of Contents
loading

Table of Contents